Comprehensive design and development study, along with other necessary studies and research, for the construction of the Olympic Beach Volley facilities and the redevelopment of the area in Faliro Bay.
DESIGN PHASE
Final - Detail Design
DESIGN PERIOD
2002-2003
OBJECT DESCRIPTION
Participation in the structural engineering team - Detail design drawings of r.c. buldings